[hpsdr] OZY repair success with questions
Sheldon Hands
as5770972 at sapo.pt
Tue Feb 17 06:48:43 PST 2009
I have found the best way to remove SMD packages is with the "cheese wire "
method. Provided there is some clearance between the package and the pins
thread some 30SWG or similar gauge thermalise or resistance wire that won´t
tin easily along the gap and tie off one end to any convinient point. next
heat the pins and draw the wire out under the leads. The track is pushed
down against the FR4 and the pins lifted clear and therefore mimises the
chance of any damage.
Shel CT1IZU
1234882123.0
More information about the Hpsdr
mailing list